Fixed monthly contract vs ad hoc maintenance: which suits your site?
Oliver Zehrung
A fixed monthly contract sets out the work a site needs over a year, prices it once and spreads the cost across equal monthly payments. The contractor plans and schedules the work against an agreed scope. Ad hoc maintenance works the other way: you call a contractor in when something needs doing, and pay for each job as it is done. Ad hoc work usually suits a small or simple site with someone on hand to notice what needs doing. A fixed contract usually suits a site that needs regular work through the year, a budget approved in advance, or a record of what was done.
This guide is about how the work is planned and paid for, not who does it. A gardener can work for a fixed monthly fee, and a landscape management contractor can take on a one-off job. The guide to gardeners and landscape management contractors covers the difference between the two. This guide is general information for Victoria, Australia, not legal advice.
How each model works
Under a fixed monthly contract, the scope is agreed before the contract starts: each area of the site, the tasks done in it and how often. The contractor schedules the visits and the seasonal work, such as pruning, mulching and weed spraying, and the fee stays the same each month. Work outside the scope is quoted separately. What you receive after each visit depends on the contract, but because the scope is written down, each visit can be checked against it.
Under ad hoc maintenance, you decide what is done and when. Each job is quoted or charged by the hour when it is booked, so you pay only for work that is done, with no ongoing commitment. The planning sits with you: someone has to notice that the hedges need cutting or the beds need weeding, arrange the visit and check the result. Most ad hoc jobs end with an invoice rather than a report.
Side by side
Area | Fixed monthly contract | Ad hoc maintenance |
|---|---|---|
How the price is set | Once a year, for the agreed scope | For each job, when it is booked |
Who plans the work | The contractor, against the scope | You, or whoever notices |
Scope | Written, by area, task and frequency | Whatever is asked for on the day |
Cost through the year | The same each month | Rises and falls with the work ordered |
Records | A visit record, if the contract requires one | Usually the invoice |
Problems on site | Found on routine visits | Found when someone notices |
Budgeting and approvals | One annual figure, approved once | Each job approved as it arises |
Quiet and busy months | Averaged into one fee | Paid for as they happen |
These are typical arrangements. Visit records and hazard reporting come from a contract's terms, not from the way it is paid, so check what a fixed contract actually commits to.
What each model really costs over a year
Compare the two on the cost of a year, not the price of a visit. Each model carries costs its price does not show.
Ad hoc work looks cheaper because you pay only when work is done. The costs it hides include:
minimum charges or call-out fees, which make small jobs expensive for the work done
catch-up work after gaps, as a hedge left too long needs renovating rather than trimming, and weeds left to seed come back in greater numbers
faults found late, such as an irrigation leak that runs for weeks before anyone books a visit
the time spent noticing what needs doing, arranging visits, approving quotes and checking the work.
A fixed contract has costs of its own:
the fee is the same in a quiet winter month as in a busy spring one, which matters if the contract ends early
the scope may be written for more than the site needs, such as visits more frequent than its growth requires
exclusions can arrive later as extra charges
the contractor's time for planning and records is part of the price.
The guide to owners corporation landscape maintenance contracts explains what belongs in a fixed fee and how prepaid work is settled if a contract ends. Most of it applies to commercial contracts too.
If a year of ad hoc work cost clearly less than a fixed contract would have, and nothing was missed or left to grow into a larger job, the site may not need a contract yet.
Where the budget is set in advance
For some readers, the bigger difference is when spending has to be approved.
Owners corporations. An owners corporation sets its annual fees from a budget approved at the annual general meeting. Grounds work under a fixed contract is a known line in that budget. Ad hoc work has to be estimated, and an unexpected cost may have to be met by a special fee, which may require a special resolution.
Commercial property managers. Where grounds costs are recovered from tenants as outgoings, the landlord usually estimates them before each accounting period, and under a retail lease must give tenants that estimate at least a month beforehand. A fixed fee makes the estimate easy to hold to. Ad hoc spending is harder to forecast, and any difference is adjusted after the period ends. The guide to grounds maintenance under a commercial lease covers outgoings in more detail.
Business owners and occupiers. For a business paying its own grounds costs, the question is simpler: whether a predictable monthly cost matters more than paying only for the work done.
When ad hoc is the better choice
Ad hoc maintenance is often the better choice, and the cheaper one, when:
the site is small, or mostly paving with little planting
the work needed is occasional, such as a seasonal tidy-up or a single hedge
someone on site notices what needs doing and can arrange it
nobody, such as a committee, owner or tenant, expects records or a forecast
the landscape carries little risk, with no trees over paths or car parks and no irrigation to fail
the budget can absorb uneven spending through the year.
It also suits one-off work, such as clearing an overgrown area before deciding what the site needs in the long term.
When a fixed contract is the better choice
A fixed contract usually earns its cost when:
the site needs work on most visits through the growing season, not only now and then
nobody on site has the time or knowledge to plan the work
spending has to be approved in advance by a committee, an owner or a budget cycle
an owner, committee or tenant expects a record of what was done
public paths, car parks, trees or irrigation make a missed problem costly
presentation matters to customers, tenants or residents all year.
Hybrid arrangements
Many sites sit between the two. Three arrangements are common.
A fixed fee plus an approved budget. Routine work is covered by the fixed fee, and work that cannot be planned, such as storm damage or replacement planting, is quoted and drawn from an annual budget the client sets. The base cost stays known without every possible event being priced into the fee.
A fixed fee plus agreed rates. Routine work is a fixed sum, and extra work is charged at rates agreed in the contract rather than quoted afresh each time. Councils commonly let grounds contracts this way, as a lump sum for routine work with a schedule of rates for work ordered as needed.
Regular visits charged by the hour. The contractor attends on a set routine but charges for the hours worked. Visits happen on schedule, but the cost still varies from month to month, and the scope tends to be whatever fits into each visit.
Whichever arrangement applies, agree who can approve extra work, and up to what amount.
Signs a site has outgrown ad hoc maintenance
Complaints about the grounds reach you before anyone has booked a visit.
The same catch-up jobs keep coming back, such as renovating hedges or clearing overgrown beds.
Grounds spending varies from year to year and is hard to explain.
Nobody can say when the hedges were last cut or the irrigation last checked.
Arranging contractors takes more of your time than the work seems to justify.
Before deciding either way, ask:
What is the minimum charge for a separate visit? It sets the real cost of small ad hoc jobs.
What does the fixed fee include, and what does it exclude? Compare the fee only with the work the site would otherwise need.
How is the fee reviewed? An even monthly fee should come with an annual review of scope and price, agreed in advance.
What happens if the contract ends early? Ask how work paid for but not yet done is settled.