What should an owners corporation landscape maintenance contract include?

Oliver Zehrung

A well-scoped landscape maintenance contract for an owners corporation sets out ten things in writing:

  • what is done in each area of common property

  • how often

  • what any fixed fees cover and exclude

  • how extra works are quoted and approved

  • what you receive after each visit

  • how chemicals are applied and residents told

  • what insurance and licences the contractor holds

  • how specialist subcontracted work is handled

  • who decides what happens about hazards the contractor finds

  • the term, price review and termination arrangements.

When a clause is missing, the gap usually shows up later as an owner complaint or an invoice the committee did not expect.

This guide is general information for Victoria, Australia, not legal advice.

The checklist

Clause

What it should say

What it prevents

Scope by area and task

Each area of common property, such as lawns, garden beds, hedges, paths and car park edges, with the tasks done in it and the standard expected

"We thought that was included"

Visit frequency

How often the contractor attends, and how that changes through the year

Missed or thin visits nobody can measure

Fixed fees and exclusions

What regular fixed fees cover, and a written list of what they do not

Exclusions arriving later as extra charges

Additional works

How extra work is quoted, who approves it and up to what amount, and the budget it is drawn from

Invoices the committee never approved

Reporting

A short record after each visit: work done, issues found, photos of hazards

No answer when an owner asks what was done

Chemical application

Licensed application, a record of each application, and how residents are notified and treated areas signed

Complaints about spraying nobody can answer

Insurance and licences

The public liability amount required, WorkCover where workers are employed, a Commercial Operator Licence if chemicals are applied, and renewed certificates each year

An uninsured incident on common property

Specialist work

Which work goes to specialist trades, how the contractor checks and oversees them, and how it is priced

Unvetted trades on site

Hazards

The contractor reports visible hazards with a priority and recommended action, urgent items the same day; the owners corporation decides what is done

Assuming the contractor "looks after" site safety

Term, review and exit

Start and end dates, the annual price and scope review, notice for ending the contract, and how work in progress is settled

Being locked into a contract that isn't working

Where disputes usually start

Vague scope. "Gardens maintained as required" cannot be checked. When an owner asks why a hedge has not been cut, neither you nor the contractor can point to a clause. Name the areas and the tasks in each, and attach a simple site plan if the property is large or spread across several buildings. List the exclusions as clearly as the inclusions: storm clean-ups, green waste disposal, irrigation repairs and blocked drains are where the arguments usually are.

No approval process for extra works. Most sites generate extra work: a fallen limb, a dead shrub, a broken sprinkler. Without an agreed process, it is either done and invoiced, or left undone because nobody asked. The contract should say that extra work is quoted in writing and approved before it starts, and who can approve it up to what amount. This limit belongs to your owners corporation, so it should match the spending authority the committee has delegated to you, with anything above it going to the committee.

No record of what was done. Without a visit report, the only evidence of the contractor's work is the invoice. A short report after each visit, listing the tasks completed and anything that needs attention, answers most owner questions before they reach you and gives the committee something to review at renewal.

What belongs in the fixed fee

A practical rule is that anything predictable goes in the fixed fee, and anything unpredictable comes from an additional works budget. Mowing, edging, weeding, seasonal pruning, mulching and a regular spraying program are predictable, so they can be priced into the year and spread across equal monthly payments. Storm damage, replacement planting and repairs are not, so they are quoted when they arise and drawn from an annual budget the committee sets.

The trade-off is that an even monthly fee means paying in quiet winter months for work done in spring. That suits an annual budget, but it matters if the contract ends early, which is why the exit clause should say how completed and prepaid work is settled. A lower fee with more exclusions is not necessarily cheaper over a year, so compare quotes on the same scope and the same exclusions.

Contract length and price review

A 12-month term lets the committee re-scope and re-test the price every year, and makes it easy to move on from a contractor that is not performing. The cost is more frequent tendering, and less reason for a contractor to learn the site well: its irrigation, drainage and recurring plant problems.

A two- or three-year term gives price stability and continuity, but only works if the contract can still be corrected along the way. Three provisions make a longer term safer:

  • an annual review of scope and price, with any change agreed in advance

  • a defined method for price changes, such as indexation to the Consumer Price Index or a capped percentage

  • a right to end the contract without cause on written notice.

Price review matters more than it used to. Annual CPI inflation was 4.0 per cent in the 12 months to August 2026, so a price fixed for three years either carries that risk for the contractor or gets reopened part-way through.

There is no statutory notice period for a grounds contract, but the Owners Corporations Act 2006 offers a benchmark. A manager's contract of appointment cannot require a tier 3, 4 or 5 owners corporation to give one month or more notice to end it, or a tier 1 or 2 owners corporation three months or more. A grounds contract asking for much longer deserves a question. Alongside the notice period, look for a right to end the contract for a breach not fixed within a set time, such as 14 days, and a clause settling work completed but not yet paid for, or paid for but not yet done.

Where Victorian owners corporation rules come in

The Act does not prescribe what a grounds contract must say, but it shapes who signs it and how it is managed.

  • The owners corporation must repair and maintain common property, including gardens. Engaging a contractor does not transfer that duty, and the owners corporation remains responsible for what its manager does on its behalf.

  • The manager acts under delegated authority. Decisions that need a special or unanimous resolution, or a general meeting, cannot be delegated. Check that the instrument of delegation covers entering the contract, and set its approval limits to match.

  • Managers must procure competitively and disclose interests. A manager must take reasonable steps to obtain services at competitive prices and on competitive terms, and disclose in writing to the chairperson any commission or beneficial relationship with the supplier.

  • The three-year limit does not apply to grounds contracts. It applies to the manager's own appointment, and to contracts a developer enters that benefit the developer. A contract the owners corporation enters itself has no statutory maximum term.

  • Tier 1 and 2 owners corporations must have a maintenance plan covering major capital items over the next 10 years. Visit reports and an annual condition review are a practical source for its landscape items, such as trees, irrigation and retaining edges.

Further reading

See how this applies to your site

A free site consultation is the simplest way to find out where your grounds stand and what a planned approach would cost. There's no obligation.

Book a free consultation

Prefer to talk first? Call 03 7035 3919 or email enquiries@gpglandscape.com.au.

Servicing commercial and industrial sites across Melbourne's south-east, including Dandenong South, Keysborough, Braeside, Moorabbin, Clayton and Mulgrave.