Before a landscape contractor starts on a commercial or strata site in Victoria, there are four basic documents you should ask them for:

  • a certificate of currency for public liability insurance

  • evidence of WorkCover insurance if they employ workers

  • a Commercial Operator Licence if they will apply herbicides or pesticides

  • their ABN.

These four cover the legal and insurance basics.

For sites with public access, chemical programs, trees near buildings or a committee that expects records, also ask how the contractor manages safety on your site:

  • their site safety assessment

  • their method statements for hazardous tasks

  • how they check their own subcontractors.

This guide is general information for Victoria, Australia, not legal advice.

The short list

Document

When to ask for it

What to check

Public liability certificate of currency

Always

Insured name matches the business you are engaging; cover amount meets your minimum; expiry date; landscape work listed as an insured activity

WorkCover insurance

The contractor employs anyone

Issued in the business's name and current

Commercial Operator Licence

Any weed spraying or pest treatment is in scope

Current, in the business's name, with the endorsement that matches the work

ABN

Always

Legal name on the ABN Lookup matches the insurance certificate

Safety system summary

Sites with public access, chemicals, trees or committee oversight

Written for how the contractor actually works, not a generic template

Site safety assessment

Before the first visit on a higher-risk site

Names your site's hazards and the controls for each

Method statements for hazardous tasks

Hazardous tasks, such as chainsaw work, chemical spraying or work beside roadways, will be carried out on site

Specific to the task, current, and signed by the workers doing it

Police checks or Working with Children Checks

Your site or policy requires them

Current, for the workers who will attend

Subcontractor checks

The contractor uses arborists or other trades

The same insurance and licence checks applied to them

Why it matters to you, not just the contractor

Grounds maintenance brings powered equipment, chemicals and people working beside paths, car parks and traffic onto your site. Under Victoria's Occupational Health and Safety Act 2004, an employer's safety duty extends to the independent contractors it engages, and their employees, for matters the employer controls. In practice, engaging a contractor does not hand the risk over completely. If a certificate has lapsed, or nobody can say what was sprayed last month, the questions come back to whoever engaged the contractor: the owners corporation, the property owner and their manager, or the business on site.

The four core documents

1. Public liability certificate of currency

Public liability insurance covers injury to other people and damage to their property caused by the contractor's work, such as a stone thrown by a mower into a car windscreen. Ask for the certificate of currency, a one-page confirmation from the insurer or broker that the policy is active, and check four things:

  • The insured name matches the business you are engaging, or connects to it through the ABN.

  • The amount meets any minimum set by your onboarding policy, the owners corporation's insurer or building management.

  • The expiry date. Certificates usually cover a 12-month period. Add a reminder in your calendar to ask for the renewed certificate before it passes.

  • The activities covered include landscape or gardening work. A policy written for another trade may not respond to a claim from grounds work.

2. WorkCover insurance

In Victoria, an employer must register for WorkCover insurance if it pays, or expects to pay, more than $7,500 a year in wages, or if it engages apprentices or trainees. WorkCover covers the contractor's own workers if they are injured on your site. A sole trader working alone does not need it, so a missing certificate is not automatically a problem. The useful question is who will actually be on site: if it is anyone other than the owner, ask for evidence of registration.

3. Commercial Operator Licence

In Victoria, a business that applies agricultural chemicals from the ground for a fee needs a Commercial Operator Licence, with endorsements for the types of chemical it may use. Ask for it whenever weed spraying or pest treatment is in scope, even as a small part of a maintenance visit. The Victorian Government will confirm on request whether a business holds a current licence and which endorsements it covers.

Also ask that each application is recorded: the product, rate, location, date and weather conditions. Those records are what you will need if a resident, owner or neighbour asks what was sprayed and when.

4. ABN

Check the ABN for free on the Australian Business Register's ABN Lookup. Confirm it is active and that the legal name matches the insurance certificate and licence. It is the quickest way to connect a trading name, a company and its documents to the same business.

How the contractor manages safety on your site

Insurance pays after something goes wrong. Safety documents show whether the contractor is working to stop it happening. For a site with public access, chemical programs or trees near buildings, the following are worth asking for.

  • A summary of their safety system: how they identify hazards, which tasks have written procedures, how equipment is checked and how incidents are reported. If there is no written system, that is useful to know before they start.

  • A site safety assessment for your site: the hazards specific to your grounds, such as underground services, overhead powerlines, uneven ground, traffic and other contractors, with a control for each and a date for review.

  • Method statements for hazardous tasks: often called safe work method statements, these set out the risks and controls for tasks such as chainsaw work, chemical application or work beside traffic.

An honest note on method statements: in Victoria, a safe work method statement is a legal requirement only for high-risk construction work. Most routine grounds maintenance is not construction work, so a contractor without them is not necessarily breaking the law.

That being said, they are still the clearest evidence that hazardous tasks have been properly thought through. A good one names the task and its hazards, is current, and is signed by the workers who do the task. A generic template with no site or worker details tells you much less.

Worker checks and subcontractors

Schools, childcare centres and other sites with children typically require Working with Children Checks for anyone working on the grounds, and some owners corporations and commercial sites ask for National Police Checks. If yours does, ask for current checks for the workers who will actually attend.

Most landscape contractors also pass some work to specialist trades, such as arborists and irrigation technicians. Ask how they check them: is the subcontractor's public liability current, do they hold any licence the work requires, and who oversees their work on your site?

How much paperwork does your site need?

Not every site needs the full list. For a small, low-traffic site with mowing and edging only, a current public liability certificate and an ABN check will meet most onboarding requirements.

The safety documents matter more as the risk rises: public paths and car parks, chemical programs, trees near buildings, children or older people using the grounds, or a committee that expects records. On those sites, how the contractor works is a bigger exposure than whether they hold a certificate.

Whatever the site, the file is only useful if it stays current. Ask for a fresh set of documents at each contract anniversary, and ask which records, such as chemical application records and hazard reports, you can see during the contract.

Further reading

See how this applies to your site

A free site consultation is the simplest way to find out where your grounds stand and what a planned approach would cost. There's no obligation.

Book a free consultation

Prefer to talk first? Call 03 7035 3919 or email enquiries@gpglandscape.com.au.

Servicing commercial and industrial sites across Melbourne's south-east, including Dandenong South, Keysborough, Braeside, Moorabbin, Clayton and Mulgrave.